Hangzhou Epsole Machinery Co.,Ltd.

News

Home - News - How to debug the energy saving machine and what is the concept?

How to debug the energy saving machine and what is the concept?

2020.08.18

① The steam pressure and external main pipe reach 7-8kg.

② The pressure reducing valve should be adjusted to 4-5 kg if the pressure relief valve is adjusted and the solution connection degree is high; 2-2.5 kg pressure should be adjusted for the low degree of solution connection. (normal product control pressure: 0.3-0.4 when the pressure gauge is offline and 0.5 when it is online)

③ Use less water cooling, control in 0.5-2 seconds is the best.

⑤ Minimize the water in the mold into the vacuum pipe.

idea:

High flow and high temperature demoulding, the moisture content of the product is about 6-7%, and the mold negative pressure reaches 5 at the moment of vacuum cooling.

Related products