1. Preparations before starting the machine: For example, check the main engine, auxiliary machines, pipelines, valves, etc. must be in good condition; lubricating oil, circulating pump, power supply voltage are normal, etc.
2. Power on: Turn on the main power switch of the power distribution cabinet, enter the equipment operation program interface, and check the storage condition of each silo.
3. Shutdown: Before shutting down the pulverizer, shut down various conditions, such as stopping feeding and turning off fans.
In a word, the attention specification of the jet mill in operation mainly starts from the inspection before starting, starting and stopping, and try to avoid the damage caused by improper operation to the mill.
The correct operating rules of the EPS shredder are the above. Please take care of your life and operate the machinery and equipment correctly.