1. Save time. The construction speed of the house is fast, and 6 people can complete the main house project of about 150 square meters (including pouring concrete on the roof) within 7 days, and then carry out fine decoration, and the overall construction until occupancy does not exceed 3 months. Save effort and effort. The construction is simple and easy, and the labor intensity is low. Under the guidance of our company’s technicians, ordinary housewives can construct, and building a house is as simple and easy as building blocks.
2. Construction process 1. Other construction procedures such as walls, windows, and door openings to be installed have been completed and passed the acceptance inspection. 1) Clean the base. ① Clean up the residual floating ash, release agent oil and other sundries on the concrete wall and hollow plastering parts. ② Remove the cracked concrete blocks, inclusions, voids, etc. at the joints of the wall, and repair them again; use 2% cement mortar to find the slope of the window sill cornice, and fill the holes in the outer wall. ③ It is required that the surface flatness deviation of the pasted polystyrene board shall not exceed 4mm. When the deviation exceeds, polish the protruding part of the wall and repair the concave part (when the thickness is greater than 6mm, use 1:3 cement mortar to plaster the surface; when the thickness is less than 6mm, the thermal insulation construction unit shall use polymer mortar to repair); guarantee The entire wall is within 4 mm, and the inner and outer corners are square and smooth.