Quick Mould Change System
Shape Moulding with hi-tech process control with advantages like, fast mould change system with a clamping frame galvanized. Mould change within 15 minutes.
Roboust body with complete milling job is done with all parts.Guide bars 2-4 pieces according to the size of the machine.
Movement
Hydraulic system allows fast movemets with a soft action, or alternative Electrical drive even more faster action. All steam and air control is proportonally driven which creates energy saving and fast cycle times.
Equipped with fast mould change system
Proportional control for Steam & Air
De-loading and Stacking robot
Surface treatment mouldings
Electrical drive with knee lever.
Machine Components
Process Control Bachmann
PLC Pneumatic Control Festo
Hydraulic Drive Parker
Electrical Component Schneider
Process control Valves Gemü
Electrical Servo Drive Schneider
Gearbox Keb