Tel: +86-18868710888 571-81110023
ricky@epsole.com
Home
Product
Video
About us
Contact us
November
When we think of the word “substitute”, we think of a replacement something that is different from the original but has some quality that makes it equal or better by offering additional options. In civil engineering, job coordinators need to take multiple considerations into account when deciding on an appropriate soil substitute. material and labor costs, material performance, availability, durability, sustainability, etc.
In a subsea SURF transportation & installation project campaign, the deployment, loadout and mobilisation of the SURF always require large reel to carry and extend them when necessary.
EPS blocks have become an excellent option to be used as landfill on highways due to their low specific weight property (about 1% of the specific weight of the soil) and good mechanical strength (approximately equal to that of a perfectly compacted soil)
January
Why does EPP need to be stored under pressure before use? Will this part restrict production and become a bottleneck? The pressing process is mainly the pretreatment of raw materials. The pressure-holding process increases the internal pressure of EPP particles and facilitates better adhesion between the particles during subsequent foaming. The pressing process does not limit production and becomes a bottleneck. Usually two factories will set Tanks to meet capacity needs.
E-mail
Message
Contact