Tel: +86-18868710888 571-81110023
ricky@epsole.com
Home
Product
Video
About us
Contact us
August
The compressed air required by EPS foam molding machine must be purified, free of water and dust.
September
In order to appreciate the new and old clients' support, our company will cooperate with Alibaba to launch a promotion sale.
① Lack of responsibility for equipment maintenance: normal and stable production of equipment is the key. ② The understanding of vacuum is not enough, and high temperature demoulding is not possible. ③ Do not know how to adjust the steam pressure for products with different density.
In summer, the peak temperature of the west wall is the highest, and the temperature fluctuation is large; in winter, the surface temperature of the south wall is highest, and the temperature fluctuation is large; in all seasons, the average temperature of the north wall is low, and the temperature fluctuation is small; the wall temperature in spring and autumn is between winter and summer.
E-mail
Message
Contact