Tel: +86-18868710888 571-81110023
ricky@epsole.com
Home
Product
Video
About us
Contact us
August
① Lack of responsibility for equipment maintenance: normal and stable production of equipment is the key. ② The understanding of vacuum is not enough, and high temperature demoulding is not possible. ③ Do not know how to adjust the steam pressure for products with different density.
In summer, the peak temperature of the west wall is the highest, and the temperature fluctuation is large; in winter, the surface temperature of the south wall is highest, and the temperature fluctuation is large; in all seasons, the average temperature of the north wall is low, and the temperature fluctuation is small; the wall temperature in spring and autumn is between winter and summer.
① Water temperature (20 ~ 30 ℃). ② Water should be filtered. ③ The vacuum pipe should be equipped with filtering device. ④ A machine with a minimum of 2.5 kW.
What are the problems with the current equipment? ① Leakage: mold, pipe. ② The maintenance of the gun hydraulic system is not in place. ③ Poor sanitation of equipment.
E-mail
Message
Contact