Tel: +86-18868710888 571-81110023
ricky@epsole.com
Home
Product
Video
About us
Contact us
September
Central vacuum system with efficient energy recycling system can reduce the consumption of vacuum and shorten the vacuum cooling period greatly by making the high temperature demolding achievable.
As the process equipment directly produced in the production, the forming mold connects the design and production. The forming mold is actually the redesign of the product, which needs to meet the shape requirements of customers as much as possible; on the other hand, the molding mold also needs to consider the actual production process, which needs to facilitate production and improve production efficiency.
It's our honour to invite you to visit our online live show: Change a mould automatically in 5 minutes. Let's take a tour in the modern EPS Shape moulding machine factory to see how we maximize the benefits. Further information, welcome to our live show at 15:00-18:00, August 12th, 2020 by clicking
welcome to our live show at 15:00-18:00, August 12th, 2020 BeiJing Time EPSOLE on line for Change a Mould Automatically In 5 mins
E-mail
Message
Contact