Tel: +86-18868710888 571-81110023
ricky@epsole.com
Home
Product
Video
About us
Contact us
November
In China, external wall insulation materials are mainly divided into four grades of fire insulation board equipment: A, B1, B2 and B3.
October
In order to forge production and research and use of lost foam energy, new lost foam forging technology and equipment should be displayed in the product.
The hot air method of the foam molding machine adopts a pre-expansion device similar to the continuous steam method, and the hot air is injected into the system, and the pre-expanded beads can be used for molding without maturation. The pre-expansion time is 4 times longer than that of the steam method, and the apparent density is difficult to control. What are the steps to make the foam machine form?
The foam equipment will be equipped with systems such as feeding, stirring, and main engine. During construction, on-site feeding, stirring, and foaming will be carried out, and the self-contained pumping system will be sent directly to the construction base through the high-pressure conveying pipe. What systems are included in general foam equipment?
E-mail
Message
Contact